The instrument enclosure will double as a travel case, with plug in points for tubing, power and comms. The instrument and calibration unit will be attached to the frame of the enclosure using 19" rackmount. There will also be shelves to deploy the dew point generator and sampling manifold.  \\  \\  The temperature within the enclosure and shed should be monitored for emergency shutdown requirements and QC. A possible solution could be interfacing the Sparkfun met sensor boards (SHT15 - $$41 \$41  - need to 2) interfaced to either the Red board control board ($19) (\$19)  or the Labjack. \subsection{Sampling manifold????}