Peter Schury edited section_Plan_for_use_of__.tex  over 8 years ago

Commit id: ded2442a860b10febbabb5b050c062643f407742

deletions | additions      

       

Unfortunately, the initial commissioning of the system was more difficult and time-consuming that initially supposed. While we have succeeded in the preliminary commissioning, including several actinide atomic mass measurements, doing so required the use of nearly all the initially assigned machine time. However, at the same time, the commissioning proved that we can simultaneously measure several isotopes, providing a new option for efficient use of future machine time. Additionally, the development of projectile beams of Ti and Cr give use the ability to extend our initial area of interest up to isotopes of Sg.  \subsection{Isotopes to be produced with $^{48}$Ca beams}  \subsection{Isotopes to be produced with $^{50}$Ti beams}  \subsection{Isotopes to be produced with $^{54}$Cr beams}  \subsection{Isotopes to be produced with $^{14}$N, $^{15}$N, and $^{22}$Ne beams}