Energy loss calculations of beam for recoil Si detectors. First what is needed is the minimum beam energy, then reduce by production target energy loss.

Summary

Experiment has been scheduled for September 22\(^{nd}\) - 28\(^{th}\). There is the possibility of pre beam production on September 1\(^{st}\) or September 15\(^{15}\).

Primary beam of \(^{34}\)S\(^{8+}\) at 374 MeV (11 MeV/u) to produce \(^{32}\)Si\(^{14+}\) (86.5%) at 10.1(3) MeV/u through a 5 mg/cm\(^2\) Be production target. Degraded \(^{34}\)S through production is 9.7(2) MeV/u.