\subsection{LNLS-UVX Statistics}
User Beam Time is scheduled only from Monday to Saturday morning and scheduling is done in a six-monthly basis.
Operating only in the week days allows some flexibility to provide compensation beam time on a weekly basis whenever it is necessary.
Weekends
are usually used for machine studies or corrective maintenance. However they can
also be used
for to provide Spontaneous User Time or even
for extra user beam period to compensate for problems in the beamlines.
Even though it is included in the total User Time, that This spontaneous extra
period beam time is
not considered accounted for
in the machine
availability but not in the reliability
calculations.
Weekends calculation, even though every fault and beam loss event in the period are
usually used considered for
other machine
studies or corrective maintenance. performance parameters, like MTBF and MDT.
Although there is no scheduled User Reserve Time, Saturdays have usually been used for that purpose.
In this case extra beam time is formally scheduled in advance and the period is included in the reliability calculation.
Table~\ref{tab:lnls-uvx-schedule} shows the scheduling and delivered beam data for the past few years.
\begin{table}