this is for holding javascript data
Demian Arancibia edited untitled.tex
almost 9 years ago
Commit id: f234488b1f58cf0b68cb9400ca1ee51e490f63e3
deletions | additions
diff --git a/untitled.tex b/untitled.tex
index f84dc25..cff02a5 100644
--- a/untitled.tex
+++ b/untitled.tex
...
\section{Overview}
This document aim to help
design build a parametric model for telescope array design using Multi-Objective Visual Analytics.
In particular, this document focus in the problem of optimizing aperture design variables
based on being mindful of their impact in
Key Array Performance Parameters.
If you are interested in contributing, please note priorities:
\begin{enumerate}
\item Make sure the list of Design Variables
and \item Make sure the list of Objectives is complete
\item Make sure each
objective Objective has a mathematical expression
\end{enumerate}
\section{Design Variables}
This section aims to include relevant aperture design variables.
...
\subsection{Aperture Diameter}
\subsection{Quantity and Position of Re-configurable Apertures}
\subsection{Quantity and Position of fixed Apertures}
\section{Objectives
and Tolerance (Key (aperture-relevant Array Performance Parameters)}
This section aims to include all the array performance parameters influenced by aperture configuration.
\subsection{Maximize Brightness Sensitivity}
\subsection{Maximize (u,v) Coverage}
\subsection{Minimize Operations Costs}
\subsubsection{Data Processing Cost}
\subsubsection{Data Transmission Cost}
\subsubsection{Calibration Cost}
\subsubsection{Power Consumption Cost}
\subsubsection{Ancilliary \subsubsection{Re-configuration Systems
Operation Cost}
\subsection{Minimize
Construction Up-front Costs}
\subsubsection{Quantity of Construction Sites}
\subsubsection{Cost of
Array Data Transmission Network Construction}
\subsubsection{Cost of Antennas Construction}
\subsubsection{Cost of Re-configuration Systems Construction}