Patrick Janot edited Cost.tex  almost 11 years ago

Commit id: dc3f6b22e28c5c9bb5102733a43ffb211a631933

deletions | additions      

       

\subsection{Elements of Costing}  The detailed costing of the TLEP project does not exist yet, and it one of the aims of the starting TLEP design study is to produce it. Preliminary estimates, however, do exist and are summarized in Table~\ref{tab:cost}. Not surprisingly, and given that the CERN site already exists and does not need to be paid for,  the tunnel, shafts and related services and infrastructure (including access roads) are account for  the dominant part largest fraction  of the cost of the complex, for a predicted total slightly above 4 billion CHF. The next two components are the 12 GV RF system and the 80 km of magnets, for a little bit less than one billion each. \label{tab:cost}  \begin{table}