loading page

Coupling of unsaturated and saturated flow modelling - a strong point of the small research catchment Uhlířská
  • Tomas Vitvar,
  • Martin Šanda,
  • Jakub Jankovec
Tomas Vitvar
Czech Technical University in Prague Faculty of Civil Engineering

Corresponding Author:[email protected]

Author Profile
Martin Šanda
Czech Technical University in Prague Faculty of Civil Engineering
Author Profile
Jakub Jankovec
Czech Technical University in Prague Faculty of Civil Engineering
Author Profile

Abstract

Modelling results in the small (1.78 km2) experimental catchment Uhlířská located in the northern part of the Czech Republic at the average elevation of 822 m a.s.l. are presented. While the basic hydrological and meteorological monitoring has started already in 1982, investigation of the subsurface flow adjoined in 1995. A detailed survey of water and isotope (18O, 2H, 3H, 3H/3He) fluxes across the catchment storage compartments has been in operation since 2006. The combined vadose/saturated zones modeling with support of partial extrapolation of 18O content in precipitation yielded the following mean balance for the period 1961-2014: 456 out of 1220 mm annual precipitation depth are percolating through the soil matrix domain and 534 mm through the preferential domain in the hillslope soil profile. The saturated zone is recharged annually by 416 mm, consisting of the entire matrix flow and 12,5 % of the preferential flow from the permeable hillslopes covered by Cambisols and Podzols, as well as by the contribution of 22 mm from the less permeable riparian wetland Histosols. The aquifer geometry was determined by means of electrical resistivity tomography (ERT) including inverse modelling (RES2DINV). Water and isotope fluxes were computed using a sequence of models. They include S1D software for the vadose zone modeling including 18O transport and Modflow, Modpath and MT3DS determining residence time and flow trajectories in the saturated zone. Isotopes 3H and 3H/3He improved the model confidence. The water residence time on the hillslopes does not exceed 1 year, while the saturated zone indicates about 10 years, with a 20% portion of water older than 100 years in the deepest part of the aquifer. The combination of numerical modelling approaches with computation of water balance and isotope-supported calibration is considered innovative, particularly the 3H/3He method to determine water residence times of young groundwater in the saturated zone.
23 Nov 2020Submitted to Hydrological Processes
24 Nov 2020Submission Checks Completed
24 Nov 2020Assigned to Editor
24 Nov 2020Reviewer(s) Assigned
09 Mar 2021Review(s) Completed, Editorial Evaluation Pending
10 Mar 2021Editorial Decision: Revise Major
24 Apr 20211st Revision Received
26 Apr 2021Submission Checks Completed
26 Apr 2021Assigned to Editor
26 Apr 2021Reviewer(s) Assigned
29 Apr 2021Review(s) Completed, Editorial Evaluation Pending
07 May 2021Editorial Decision: Revise Major
09 Jul 20212nd Revision Received
19 Jul 2021Reviewer(s) Assigned
19 Jul 2021Submission Checks Completed
19 Jul 2021Assigned to Editor
19 Jul 2021Review(s) Completed, Editorial Evaluation Pending
23 Jul 2021Editorial Decision: Revise Minor
04 Aug 20213rd Revision Received
05 Aug 2021Assigned to Editor
05 Aug 2021Submission Checks Completed
05 Aug 2021Reviewer(s) Assigned
02 Sep 2021Review(s) Completed, Editorial Evaluation Pending
08 Sep 2021Editorial Decision: Revise Major
28 Nov 20214th Revision Received
29 Nov 2021Submission Checks Completed
29 Nov 2021Assigned to Editor
29 Nov 2021Reviewer(s) Assigned
29 Nov 2021Review(s) Completed, Editorial Evaluation Pending
30 Nov 2021Editorial Decision: Revise Minor
31 Dec 20215th Revision Received
02 Jan 2022Submission Checks Completed
02 Jan 2022Assigned to Editor
06 Jan 2022Reviewer(s) Assigned
06 Jan 2022Review(s) Completed, Editorial Evaluation Pending
08 Jan 2022Editorial Decision: Revise Minor
01 Feb 20226th Revision Received
03 Feb 2022Assigned to Editor
03 Feb 2022Submission Checks Completed
03 Feb 2022Reviewer(s) Assigned
03 Feb 2022Review(s) Completed, Editorial Evaluation Pending
04 Feb 2022Editorial Decision: Accept